Residual Risks in Secure Software Development | CSSLP Exam

Residual Risks in Secure Software Development

Question

Which of the following statements is true about residual risks?

Answers

Explanations

Click on the arrows to vote for the correct answer

A. B. C. D.

vulnerability)

Answer: B is incorrect.

In information security, security risks are considered as an indicator of threats coupled with vulnerability.

In other words,

The residual risk is the risk or danger of an action or an event, a method or a (technical) process that still conceives these dangers even if all theoretically possible safety measures would be applied.

The formula to calculate residual risk is (inherent risk) x (control risk) where inherent risk is (threats security risk is a probabilistic function of a given threat agent exercising a particular vulnerability and the impact of that risk on the organization.

Security risks can be exploited by a threat, thus causing harm to the information systems or networks.

It can exist in hardware , operating systems, firmware, applications, and configuration files.

Vulnerability has been variously defined in the current context as follows: 1.A security weakness in a Target of Evaluation due to failures in analysis, design, implementation, or operation and such.

2.Weakness in an information system or components (e.g.

system security procedures, hardware design, or internal controls that could be exploited to produce an information-related misfortune.) 3.The existence of a weakness, design, or implementation error that can lead to an unexpected, undesirable event compromising the security of the system, network, application, or protocol involved.

Residual risk refers to the level of risk that remains after all possible security measures have been implemented to reduce the risk to an acceptable level.

Option A - "It is the probabilistic risk after implementing all security measures." is incorrect because residual risk is the remaining risk after implementing security measures, not the risk after implementing all security measures.

Option B - "It can be considered as an indicator of threats coupled with vulnerability." is also incorrect because residual risk is not an indicator but the actual risk that remains after mitigating measures have been taken.

Option C - "It is a weakness or lack of safeguard that can be exploited by a threat." is also incorrect because it describes a vulnerability, not residual risk.

Option D - "It is the probabilistic risk before implementing all security measures." is the correct answer. Residual risk is the probability of harm to an organization, system, or asset before security measures are implemented, and it is the risk that remains after all the mitigation strategies have been implemented.

It's important to note that residual risk can never be fully eliminated, as there is always a chance that a threat or vulnerability will be discovered or that new threats will emerge, requiring additional mitigation measures. Therefore, residual risk must be regularly monitored and evaluated to ensure that it remains within acceptable levels.